Illinois State Library

Electronic Documents of Illinois


Search:
U* in FirstWord [X]
Illinois Environmental Protection Agency, Bureau of Water in Organization [X]
rss icon RSS
Results:  6 Items
Sorted by:  
Page: 1
Organization
Illinois Environmental Protection Agency, Bureau of Water[X]
XMLRecordID
000000040716 (1)
000000040762 (1)
000000040763 (1)
000000041173 (1)
000000042867 (1)
DateCreated
 

Title:  

Up-dating the LaMoine River Watershed Implementation Plan

 
 Volume/Number:  2008 July 31 
 Issuing Agency:   
 Description:  This report brings uptodate the original La Moine River Watershed Plan, 2006, which addressed local stakeholder concerns related to water quality, erosion, wildlife habitat and education. Available and accessible data were analyzed to determine priority subwatersheds based on project goal areas. Subsequently, potential Best Management Practices (BMPs) were identified using aerial photo interpretation, and expected load reductions were calculated. Although information provided in the watershed plan was extensive, data gaps did exist. Missing information included the extent and severity of gully and streambank erosion and the location andimpact of livestoperationsVerification of BMPs outlined the plan was also needed. An IEPA 319 grant was pursued funding was acquired to address these data gaps and conduct sampling in priority subwatersheds. The report outlines methodologies and results from the assessment work. 
 Date Created:  09 30 2008 
 Agency ID:   
 ISL ID:  000000041173   Original UID: 21128 FIRST WORD: Up 
 

Title:  

Upper Big Muddy Watershed Total Maximum Daily Load Stage One Report

 
 Volume/Number:  2014 January 31 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01-31-2014 
 Agency ID:   
 ISL ID:  000000061727   Original UID: 181776 FIRST WORD: Upper 
 

Title:  

Upper Fox River/Chain O' Lakes Watershed TMDL Final Stage 1 Report

 
 Volume/Number:  2010 March 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 01 2010 
 Agency ID:  Document No.: 60133219-601 
 ISL ID:  000000040762   Original UID: 20934 FIRST WORD: Upper 
 

Title:  

Upper Fox River/Flint Creek Watershed TMDL Final Stage 1 Report

 
 Volume/Number:  2010 March 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  03 08 2010 
 Agency ID:  Document No.: 60133219-106 
 ISL ID:  000000040763   Original UID: 20935 FIRST WORD: Upper 
 

Title:  

Upper North Branch Chicago River Watershed TMDL Stage 1 Report

 
 Volume/Number:  2009 November 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  12 02 2009 
 Agency ID:  10042-003-801 
 ISL ID:  000000040716   Original UID: 20892 FIRST WORD: Upper 
 

Title:  

Utilizing Exception Criteria to Avoid Boil Orders after Pressure Loss

 
 Volume/Number:  2011 November 
 Issuing Agency:   
 Description:  Under Illinois Pollution Control Boards regulations, any situation which results in water pressure falling below 20 pounds per square inch (psi) in any part of a public water supplys distribution system requires the issuance of a boil order for affected customers, unless certain historical information is available and other steps are taken. 
 Date Created:  11 15 2011 
 Agency ID:   
 ISL ID:  000000042867   Original UID: 22427 FIRST WORD: Utilizing